1950 Avalon trailer
Sunday, September 12, 2021
Overhead cabinet progress
Monday, December 7, 2020
Street side bench in place at secured to wall
Thursday, October 29, 2020
Street side wall framed and paneled.
birch paneling replace on newly framed curb side wall
Repacing curb side wall framing one piece at a time.
Tuesday, July 23, 2019
Kitchen cabinet finished with water damaged end panel replaced and new boomerang laminate installed.
Marmoleum sheet material installed.
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)